Final | 5/13/2016 | 5/13/2016 | 5/13/2016 | P | PASS |
Ben Livingston
|
|
|
LATE PM IF POSSIBLE- TRIM FINAL INSTALLER : SCOTT ###-#### THANK YOU Phone #: ###-#### Inspection requested via web by Dustin Rich
|
Rough-in | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | PASS |
Ben Livingston
|
|
|
Please call with questions Phone #: ###-#### Inspection requested via web by Dustin Rich
|
Rough-in | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Dustin Rich
|
Rough-in | 3/17/2016 | 3/18/2016 | 3/18/2016 | P | FAIL |
Ben Livingston
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Dustin Rich- dryer vent needs nail plate on both sides
|
Pressure Test | 3/17/2016 | 3/18/2016 | 3/18/2016 | P | PASS |
Ben Livingston
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Dustin Rich- 20lb gas, 5lb flue
|