Final | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Rough-in | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Chad Schwendiman
|
|
|
|
Rough-in | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | FAIL |
Chad Schwendiman
|
|
|
as late as possable Phone #: ###-#### Inspection requested via web by Gary Reeves - ducting on the 1st floor doesn't match the revised manual J.
|
Pressure Test | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves-20 lb gas test and flue test pass.
|
Rough-in | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves-Need approved manual-j on site for rough-in.Need to cut in tabs on insulation sheild garage level.
|