Final | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart
|
Final | 5/13/2016 | 5/16/2016 | 5/16/2016 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart 1) provide air balance report for the 2nd floor furnace 2) provide a return air path for the 1st floor south bedroom.
|
Rough-in | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PART |
Alan Hauser
|
|
|
hvac ok, need to finish framing at dryer vent that is outside wall cavity
|
Pressure Test | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Alan Hauser
|
|
|
20#
|