Final | 2/8/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Brian Scoles
|
|
|
Maintenance wants the inspection between 1:30 and 3:30 to not interfere with activities at the school or lunch break. Please call well ahead so we can have our installer there to point ; show Vic ###-#### Phone #: ###-#### Inspection requested via web by Nicole Kimball- this was a reroof project- had to lift up existing units and reinstall- all good- final ok
|
Mec-Aging Inspection | 1/18/2018 | 1/18/2018 | 1/18/2018 | | PEND |
Brian Scoles
|
|
|
contractor will schedule final per phone call
|
Mec-Aging Inspection | 10/19/2017 | 10/19/2017 | 10/20/2017 | | CANC |
Alan Hauser
|
|
|
|
Mec-Aging Inspection | 7/20/2017 | 7/20/2017 | 7/20/2017 | | CANC |
Alan Hauser
|
|
|
|
Mec-Aging Inspection | 4/20/2017 | 4/20/2017 | 4/24/2017 | | CANC |
Alan Hauser
|
|
|
|
Mec-Aging Inspection | 1/10/2017 | 1/10/2017 | 1/10/2017 | | FAIL |
Alan Hauser
|
|
|
waiting for hvac contractor to call for final
|
Mec-Aging Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | | CANC |
Chad Schwendiman
|
|
|
|