Final | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Chad Schwendiman
|
|
|
Request for final inspection Live Works. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Final | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | FAIL |
Chad Schwendiman
|
|
|
Need Charcoal filters in range hoods per manufactures instructions
|
Final | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | PART |
Chad Schwendiman
|
|
|
final inspection request for elevator and housing lobby. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - elevator lobby, and parking lobby okay
|
Mec-Aging Inspection | 12/26/2017 | 12/26/2017 | 12/26/2017 | | PEND |
Eric Strole
|
|
|
|
Mec-Aging Inspection | 9/26/2017 | 9/26/2017 | 9/26/2017 | | CANC |
Chad Schwendiman
|
|
|
|
Rough-in | 6/27/2017 | 6/27/2017 | 6/27/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for 2nd floor shaft inspection. Please contact Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Duct supports and seal okay in second floor mechanical shaft. still have more work to do in this area.
|
Conference | 6/15/2017 | 6/15/2017 | 6/15/2017 | A | DONE |
Chad Schwendiman
|
|
|
Consultation inspection for 2nd floor - Please call Rob with questions ###-####. Phone #: ###-#### Inspection requested via web by Bailey Esposito - Met on site with Rob to look at what they have done so far and what they are planning to do. I let him know at what stages we need to inspect the sub duct shafts.
|
Mec-Aging Inspection | 5/15/2017 | 5/15/2017 | 5/15/2017 | | CANC |
Chad Schwendiman
|
|
|
wip
|
Mec-Aging Inspection | 2/13/2017 | 2/13/2017 | 2/13/2017 | | CANC |
Chad Schwendiman
|
|
|
wip
|
Conference | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | DONE |
Chad Schwendiman
|
|
|
Request for conference with Dave Hannah, structural inspector, and mechanical inspector to discuss need of sheet rock in areas. Please contact job lead, Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - they are going to fur out the wall above the drop ceiling to allow the 4" elbows to be installed and not crushed or altered
|
Conference | 11/14/2016 | 11/14/2016 | 11/15/2016 | A | PART |
Bill VanDegrift
|
|
|
Conference to look at dryer duct mock up met with Chad to go over dryer duct, will meet with bld inspector
|
Conference | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | DONE |
Chad Schwendiman
|
|
|
Request for inspection conference. Please contact Rob Campbell, job lead, with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - Met on site with Bill and looked at their proposed dryer duct in the walls with soldered ovaled elbows. They are going to scheduke a conference for tomorrow with Dave Hannah and us to see if the wall needs to be sheetrocked in the area of the elbow. If not then the elbow may not need to be ovaled
|
Mec-Aging Inspection | 11/10/2016 | 11/10/2016 | 11/10/2016 | | CANC |
Chad Schwendiman
|
|
|
wip
|