Final | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Rough-in | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves-Need insulation sheild with minimum of 1" clearance around b-vent top flr. Need to finish running line-set
|
Pressure Test | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves-20 lb gas test pass
|
Pressure Test | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves-20 lb gas test fail
|
Rough-in | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves-Need to finish running line-set.
|
Pressure Test | 5/9/2016 | 5/10/2016 | 5/10/2016 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Reeves Inspection cancelled from web by: Gary Reeves
|
Rough-in | 5/9/2016 | 5/10/2016 | 5/10/2016 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Reeves Inspection cancelled from web by: Gary Reeves
|