Final | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Ben Livingston
|
|
|
please call ahead, Jordan (QHC) @ ###-#### or Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley- 5lb flue
|
Pressure Test | 5/19/2016 | 5/20/2016 | 5/19/2016 | A | PART |
Ben Livingston
|
|
|
Please call ahead, need PVC flue test and gas line test, Jordan (QHC) @ ###-#### or Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley- 20 lb gas pass, need 5 lb flue
|