Final | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Chad Schwendiman
|
|
|
|
Pressure Test | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PART |
Chad Schwendiman
|
|
|
RYAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 60lb gas pass on piping from meter up to equipment on the roof of the gbad building, 100lb hydronic piping pass on piping inside of the 5th floor mechanical room.
|
Rough-in | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PART |
Chad Schwendiman
|
|
|
RYAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 60lb gas pass on piping from meter up to equipment on the roof of the gbad building, 100lb hydronic piping pass on piping inside of the 5th floor mechanical room.
|
Pressure Test | 8/18/2016 | 8/18/2016 | 8/18/2016 | P | PART |
Chad Schwendiman
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 100lb hydronic piping pass for 4th floor gbad elevator lobby
|
Pressure Test | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | CANC |
Chad Schwendiman
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - this is the wrong permit
|
Pressure Test | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PART |
Chad Schwendiman
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 100lb hydronic piping pass in shaft of Gbad
|