Final | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Ben Livingston
|
|
|
Final Re inspect - If there are questions about what was fixed, please call Wade ###-#### Phone #: ###-#### Inspection requested via web by Konrad Swartz
|
Final | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | FAIL |
Ben Livingston
|
|
|
Inspection requested via web by Konrad Swartz 2nd condensate line cannot tie into primary,
|
Pressure Test | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Ben Livingston
|
|
|
inpsect gas line to firepit Inspection requested via web by Konrad Swartz- 20lb gas
|
Pressure Test | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Konrad Swartz 20lb gas
|
Rough-in | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Konrad Swartz
|
Pressure Test | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PART |
Ben Livingston
|
|
|
Inspection requested via web by Konrad Swartz 5lb flue pass, gas pressure gage didnt zero out
|