Final | 7/22/2016 | 7/25/2016 | 7/25/2016 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee
|
Rough-in | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Chad Schwendiman
|
|
|
Ceiling cover inspection. Thank you! Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - okay to cover grid ceiling
|
Rough-in | 5/28/2016 | 5/31/2016 | 5/31/2016 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee
|
Rough-in | 5/25/2016 | 5/26/2016 | 5/26/2016 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - Ductwork not complete above bathroom ceilings, linesets aren't roughed in for ductless split system, rough in does not match the approved drawing. need to submit new drawing or rough in per approved drawings
|
Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | FAIL |
Chad Schwendiman
|
|
|
Rough in - Thank you! Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - Need to group MEC permit to BLD permit. Plans have not been approved for this job yet
|