Final | 7/18/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Ben Livingston
|
|
|
Please complete as early as possible this afternoon - Phone #: ###-#### Inspection requested via web by Troy Worley
|
Final | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Worley- need to run 2nd condensate drain, armaflex needs uv protection complete
|
Rough-in | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Troy Worley
|
Rough-in | 5/25/2016 | 5/31/2016 | 5/31/2016 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Worley- need accor report
|
Pressure Test | 5/25/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Worley- 20 lb gas 5lb flue
|
Rough-in | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | FAIL |
Ben Livingston
|
|
|
This is a retrofit installation. The meter is not yet in place for a pressure test. If we could just get the rough in passed that would be great. Thank you. If you have any questions please call Nate- directly at 208.697.0163 Phone #: ###-#### Inspection requested via web by Troy Worley need to submit an accor report for approval, and have on site for inspection.
|