Final | 6/27/2016 | 6/27/2016 | 6/27/2016 | P | PASS |
Troy James
|
|
|
no occupancy card on site to sign
|
Final | 6/15/2016 | 6/16/2016 | 6/16/2016 | A | PART |
Chad Schwendiman
|
|
|
Would like to get a partial final on this job, still waiting for HVAC system to be finished so the Balance Report can be issued. Phone #: ###-#### Inspection requested via web by Drew Tverdy - partial final okay. Just waiting on air balance report
|
Rough-in | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Troy James
|
|
|
light test inspection will be ready around 3 p.m. Phone #: ###-#### Inspection requested via web by Drew Tverdy Found holes in the welds. Contractor fixed holes. Light test ok
|