Final | 10/20/2016 | 10/21/2016 | 10/21/2016 | A | PASS |
Ben Livingston
|
|
|
Workers should be on site. If not, call Mark: ###-####. Phone #: ###-#### Inspection requested via web by Frank Marturello
|
Rough-in | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | PASS |
Brian Scoles
|
|
|
Re-inspection rough in garage. Phone #: ###-#### Inspection requested via web by Frank Marturello
|
Rough-in | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | FAIL |
Brian Scoles
|
|
|
Rough in for garage. Phone #: ###-#### Inspection requested via web by Frank Marturello- exhaust fans need to be vented out and flexes hooked up- drain for mini split can not be ran in flexible tubing, not an approved method- left correction notice upstairs east window
|
Pressure Test | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Ben Livingston
|
|
|
Mark: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello 20lb gas and 5lb flue pass
|
Rough-in | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Ben Livingston
|
|
|
Mark: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello
|