Pressure Test | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Eric Strole
|
|
|
20 lb underground gas test pass
|
DOC - Permit Finaled | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Eric Strole
|
|
|
|
Final | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Rough-in | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer-20 lb gas test and rough-in pass
|
Rough-in | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer - need 1 inch clearance between b vent and insulation shield
|
Rough-in | 7/13/2016 | 7/13/2016 | 7/13/2016 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Palmer Inspection cancelled from web by: Bryan Palmer
|
Pressure Test | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer-20 lb gas test pass
|
Rough-in | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer-No manual-j on site
|