Final | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 7/6/2016 | 7/7/2016 | 7/6/2016 | P | CANC |
Alan Hauser
|
|
|
Phone #: ###-#### >> Inspection requested via web by Troy Worley Inspection cancelled from web by: Troy Worley
|
Rough-in | 7/6/2016 | 7/7/2016 | 7/6/2016 | P | CANC |
Alan Hauser
|
|
|
Phone #: ###-#### >> Inspection requested via web by Troy Worley Inspection cancelled from web by: Troy Worley
|
Rough-in | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Worley Need to remove roofing material from b-vent. Need to connect bath fans. Replace all 4x10 boots with 7" supply to 4x12.
|
Pressure Test | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Worley Bad guage on test. Unable to get it to drop to zero. Remove and replace and retest.
|
Rough-in | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | NR |
Alan Hauser
|
|
|
need to finish walkway to equipment platform
|
Pressure Test | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | NR |
Alan Hauser
|
|
|
no gas ran yet
|