Final | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Chad Schwendiman
|
|
|
Please Call Rich Beckstead Project Manager at ###-#### as the building is locked and will need to gain access Phone #: ###-#### Inspection requested via web by patrick graves
|
Final | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | FAIL |
Chad Schwendiman
|
|
|
Please call Rich Beckstead Project Manager at ###-#### before going to inspection as the building is locked. Phone #: ###-#### Inspection requested via web by patrick graves - Horizontal Flue vents need to slope up a 1/4" per foot from appliance to termination. Need 1" c;earance between b-vent and combustables
|
Rough-in | 8/3/2016 | 8/5/2016 | 8/5/2016 | A | PART |
Chad Schwendiman
|
|
|
Inspection of refrigerant on 1st floor Phone #: ###-#### Inspection requested via web by patrick graves - refrigerant piping okay in 1st floor
|
Rough-in | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | PART |
Chad Schwendiman
|
|
|
For Exhaust fans on 1st and 2nd floor Phone #: ###-#### Inspection requested via web by patrick graves - okay to cover bathroom ceiling on 1st floor
|