Final | 3/7/2017 | 3/14/2017 | 3/14/2017 | A | PASS |
Brian Scoles
|
|
|
Requesting final inspection on furnace. Homeowner has requested to change the final inspection to 3-14-17. If you have any question please feel free to contact me @ ###-#### (Annie). Homeowner: Heidi ph# ###-#### Phone #: ###-#### Inspection requested via web by Annie Foster
|
Final | 3/3/2017 | 3/8/2017 | 3/7/2017 | A | CANC |
Brian Scoles
|
|
|
Installation of Air Handler & Heat pump. Requesting final inspection. Call Eric @ ###-#### with any installation issues/questions. Phone #: ###-#### >> Inspection requested via web by Annie Foster Inspection cancelled from web by: Annie Foster
|
Mec-Aging Inspection | 2/23/2017 | 2/23/2017 | 2/23/2017 | | PEND |
Brian Scoles
|
|
|
contrator will try to schedule for final
|
Final | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | NR |
Brian Scoles
|
|
|
Installation of Air Handler ; Heat Pump. Requesting final inspection to be in the afternoon once system has been installed. Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Annie Foster - will reschedule
|