Final | 11/18/2016 | 11/21/2016 | 11/21/2016 | A | PASS |
Ben Livingston
|
|
|
Marco Phone #: ###-####
|
Pressure Test | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by marco gomez 20lb gas
|
Pressure Test | 10/6/2016 | 10/6/2016 | 10/6/2016 | P | PASS |
Ben Livingston
|
|
|
would like call ahead; Marco Phone #: 353-5 60lb gas
|
Rough-in | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | PASS |
Ben Livingston
|
|
|
Marco Phone #: ###-####
|
Rough-in | 8/10/2016 | 8/10/2016 | 8/10/2016 | P | FAIL |
Ben Livingston
|
|
|
marco Phone #: ###-####- 14" fresh air needs to draw from outside of the building
|
Rough-in | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | FAIL |
Ben Livingston
|
|
|
Marco Phone #: ###-####- crawl needs to be complette, approved manual j needs to be on site
|
Pressure Test | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Ben Livingston
|
|
|
Marco Phone #: ###-####- 20 lb gas, 5lb flue x2
|