Final | 9/22/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Worley
|
Conference | 9/22/2016 | 9/23/2016 | 9/22/2016 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Troy Worley Inspection cancelled from web by: Troy Worley
|
Rough-in | 8/4/2016 | 8/8/2016 | 8/8/2016 | A | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Troy Worley
|
Rough-in | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Worley - 4x10x7 is under sized for CFM in bedroom #3- 1" clearance for b-vent to insulation shield in garage- nail plate on line set in kitchen ceiling level missing- outside air not connected in attic- vents for bath fans not connected- left correction notice
|
Pressure Test | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Worley - 20lb gas pass
|