Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberMEC16-03545
StatusFinaled
Name INTEGRITY HEATING & AIR
Site Address 6590 E DEER RIDGE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Complete HVAC Installation: Install complete new hvac work in new construction home
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/19/20177/19/20177/19/2017PPASS
DetailsBrian Scoles
Conference7/19/20177/19/20177/19/2017APASS
DetailsBrian Scoles
Mec-Aging Inspection6/8/20176/8/20176/8/2017 NH
DetailsBrian Scoles
no one home- left notice front door
Mec-Aging Inspection3/9/20173/9/20173/9/2017 NH
DetailsBrian Scoles
no one home- talked with contractor and they will research this and get final called in-
Rough-in8/26/20168/26/20168/26/2016APASS
DetailsBrian Scoles
Inspection requested via web by Troy Worley
Rough-in8/25/20168/25/20168/25/2016PFAIL
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Troy Worley - corrections still not made
Rough-in8/25/20168/25/20168/25/2016AFAIL
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Troy Worley - correction still not made- need bath fans hooked up- nail plate for gas line bedroom #2 floor level- nail plate garage door entrance to house at floor level- nail plates 2nd level at floor and ceiling both sides- supply line to kitchen off main trunk needs better flow, tap pinched off
Pressure Test8/25/20168/25/20168/25/2016APASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Troy Worley
Rough-in8/23/20168/24/20168/24/2016AFAIL
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Troy Worley - corrections not made
Rough-in8/19/20168/19/20168/19/2016PFAIL
DetailsBrian Scoles
Inspection requested via web by Troy Worley - no bath fans installed, need flexes hooked up- nail plates for gas line bedroom #2 floor level, garage door entrance to house floor level, 2nd level gas line floor and ceiling both sides- supply line to kitchen off main supply trunk line needs better flow/ pinched at tap- left correction notice front window
Pressure Test8/19/20168/19/20168/19/2016PPASS
DetailsBrian Scoles
Inspection requested via web by Troy Worley - 20lb gas pass
Pressure Test8/9/20168/9/20168/9/2016PNR
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Troy Worley
Rough-in8/9/20168/9/20168/9/2016PNR
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Troy Worley