Final | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Rough-in | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Chad Schwendiman
|
|
|
Oleg Phone #: ###-####
|
Pressure Test | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Chad Schwendiman
|
|
|
Oleg Phone #: ###-#### - 20lb gas 5lb flue
|
Rough-in | 8/10/2016 | 8/10/2016 | 8/10/2016 | P | FAIL |
Chad Schwendiman
|
|
|
Oleg Phone #: ###-#### - The equipment installed doesn't match the approved manual J
|
Pressure Test | 8/10/2016 | 8/10/2016 | 8/10/2016 | P | PASS |
Chad Schwendiman
|
|
|
Oleg Phone #: ###-#### - 20lb gas, 5lb flue pass
|