Final | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | PASS |
Ben Livingston
|
|
|
Oleg Phone #: ###-####
|
Final | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | FAIL |
Ben Livingston
|
|
|
Oleg Phone #: ###-#### furnace needs combustion air, armaflex needs uv protective tape
|
Rough-in | 8/19/2016 | 8/22/2016 | 8/22/2016 | A | PASS |
Ben Livingston
|
|
|
Oleg Phone #: ###-####
|
Rough-in | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | FAIL |
Ben Livingston
|
|
|
Oleg Phone #: ###-####- need resubmitted manual j on site for inspection
|
Pressure Test | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | CANC |
Eric Strole
|
|
|
Oleg Phone #: ###-####
|
Rough-in | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | CANC |
Eric Strole
|
|
|
Oleg-fireplace Phone #: ###-####
|
Rough-in | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | FAIL |
Eric Strole
|
|
|
Oleg Phone #: ###-####-Need to resummit manual-j (There is no basement plan on manual-j) Fresh air needs to come off return air plenum. No w/h flue run at this time.
|
Rough-in | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | FAIL |
Ben Livingston
|
|
|
Oleg Phone #: ###-####- need approved manual j on site for rough in inspection
|
Pressure Test | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Ben Livingston
|
|
|
Oleg Phone #: ###-####- 20lb gas, 5lb flue
|
Rough-in | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Ben Livingston
|
|
|
Oleg-fireplace Phone #: ###-####- fireplace
|