Final | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
Rough-in | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
Rough-in | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero - need 5/8 inch gap on each side of fireplace- verify clearances on penetration thru wall
|