Final | 10/27/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Ben Livingston
|
|
|
Air balance test is finished. Please call Jason @ ###-#### to let him know you''re on your way. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg
|
Rough-in | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Brian Scoles
|
|
|
looked over manual J with contractor- verified outside air and registers sizes and locations-
|
Final | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PART |
Brian Scoles
|
|
|
air balance report needs to be onsite to final
|
Final | 9/19/2016 | 9/22/2016 | 9/22/2016 | P | PART |
Brian Scoles
|
|
|
Please call Dwight @ ###-#### to make sure he''s ready for you. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg- flue test ok- need air balance report- need duct blast report- was never called in for rough in, i looked it over per manual J online
|
Pressure Test | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | PASS |
Brian Scoles
|
|
|
Please call Dwight @ ###-#### to make sure he''s ready for you. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg- 5lb flue pass
|
Conference | 9/12/2016 | 9/13/2016 | 9/13/2016 | P | NR |
Brian Scoles
|
|
|
Please call Dwight @ ###-#### to make sure he''s ready for you. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg- will reschedule
|
Pressure Test | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Brian Scoles
|
|
|
Dwight Phone #: ###-#### - 20lb gas pass
|