Final | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | PASS |
Brian Scoles
|
|
|
Prefer A.M. Final inspection for Human Bean Thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin- occupancy card signed off
|
Rough-in | 9/12/2016 | 9/13/2016 | 9/13/2016 | A | PASS |
Brian Scoles
|
|
|
Can we please get a re-inspection for Human Bean thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin
|
Rough-in | 9/9/2016 | 9/9/2016 | 9/9/2016 | A | FAIL |
Brian Scoles
|
|
|
condensate drain needs to be ran in approved method to outside of building
|
Rough-in | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Karl Hestekin- need access to attic- contractor will contact me when availableto meet- need approved drawings onsite
|