Rough-in | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | PASS |
Brian Scoles
|
|
|
meet ken at 10 AM - should have been final
|
Final | 8/25/2016 | 8/25/2016 | 8/25/2016 | P | PASS |
Brian Scoles
|
|
|
should have been final
|
Rough-in | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | NR |
Brian Scoles
|
|
|
would like call ahead; Ken Phone #: ###-#### - reschedule for tomorrow- need insulation shield and 1 inch clearance on B vent - reschedule for 10 AM tomorrow
|