Pressure Test | 9/9/2016 | 9/12/2016 | 9/12/2016 | P | PASS |
Brian Scoles
|
|
|
LATE PM IF POSSIBLE PLEASE INSTALLER: MIGUEL ###-#### THANK YOU Phone #: ###-#### Inspection requested via web by Dustin Rich- 20lb gas pass- should have been a final
|
Final | 9/12/2016 | 9/12/2016 | 9/12/2016 | P | PASS |
Brian Scoles
|
|
|
LATE PM IF POSSIBLE PLEASE INSTALLER: MIGUEL ###-#### THANK YOU Phone #: ###-#### Inspection requested via web by Dustin Rich- 20lb gas pass
|