Final | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart
|
Final | 11/29/2016 | 11/30/2016 | 11/30/2016 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart need balance report, armaflex needs uv protection
|
Rough-in | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart 20lb gas, rough in
|
Pressure Test | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart 20lb gas , needs 10mill tape
|
Rough-in | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart 8" supply feeding 2nd floor has a rip in the flex
|