Final | 5/31/2017 | 6/1/2017 | 6/2/2017 | P | PASS |
Brian Scoles
|
|
|
RICH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Pressure Test | 3/10/2017 | 3/13/2017 | 3/13/2017 | P | PASS |
Brian Scoles
|
|
|
RICH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- (1) 1' line and (2) 3/4" lines on roof 60lb gas test pass- all building has been tested
|
Pressure Test | 3/8/2017 | 3/9/2017 | 3/9/2017 | A | CANC |
Brian Scoles
|
|
|
RICH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- this inspection was completed yesterday-
|
Pressure Test | 3/7/2017 | 3/8/2017 | 3/8/2017 | P | PART |
Brian Scoles
|
|
|
RICH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60 lb gas pass on (1) 1.5 pipe and (2) 1.25 pipe from meter bar to inside of building to unit heaters and stubs thru roof- will test roof at another time (3) places
|
Pressure Test | 3/6/2017 | 3/7/2017 | 3/7/2017 | P | NR |
Brian Scoles
|
|
|
RICH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- will reschedule
|