Final | 9/20/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Ben Livingston
|
|
|
Please call Dave at ###-#### with a 30 minute heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole
|
Final | 9/19/2016 | 9/19/2016 | 9/19/2016 | P | NR |
Chad Schwendiman
|
|
|
Please call Dave at ###-#### with a 30 minute heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole Not ready for a final. need to see once fireplace has been vented
|
Pressure Test | 9/19/2016 | 9/19/2016 | 9/19/2016 | P | PASS |
Chad Schwendiman
|
|
|
Please call Dave at ###-#### with a 30 minute heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole - 20lb gas pass
|