Final | 11/15/2016 | 11/17/2016 | 11/18/2016 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Rough-in | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer- coil doesnt match manual j- guys on vacation that does them- everything else good- check at final for change
|
Rough-in | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer- need approved manual j- combustion air- insulation shield needs to not move, 1 inch clearance to b vent- LEFT JOBSITE CONTRACTOR HIT GAS MAIN
|
Pressure Test | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer- 20lb gas pass
|