Final | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Ben Livingston
|
|
|
Please call Dan at ###-#### with a 30 minute heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole 5lb flue
|
Final | 10/4/2016 | 10/6/2016 | 10/6/2016 | A | NR |
Ben Livingston
|
|
|
Please call Dan at ###-#### with a 30 minute heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole
|
Pressure Test | 10/4/2016 | 10/5/2016 | 10/5/2016 | P | CANC |
Ben Livingston
|
|
|
Please call Dan at ###-#### with a 30 minute heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole under 6' bubble test gas line
|