Final | 12/28/2016 | 12/28/2016 | 12/28/2016 | P | PASS |
Ben Livingston
|
|
|
Oleg Phone #: ###-####
|
Final | 12/22/2016 | 12/23/2016 | 12/23/2016 | A | FAIL |
Ben Livingston
|
|
|
Oleg Phone #: ###-#### fresh air needs to be ins. armaflex needs uv protection
|
Rough-in | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | PASS |
Ben Livingston
|
|
|
Oleg Phone #: ###-####
|
Rough-in | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- need combustion air in furnace/wh closet-crawl needs finished-need fresh air for furnace installed- boot for power ventilated crawl has to be in open area of house- insulation shield needs 1" clearance to b vent- b vent needs 1" clearance to combustibles- need 6" fresh air to return plenum-wall needs framed around supply duct 2nd floor, flex in pinched off-need return air to master bedroom- transfer grills for upstairs bedrooms -firecaulk gas line where it penetrates into dryer box- left correction notice on front window
|
Pressure Test | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Oleg Chervak- 20lb gas pass- 5lb flue pass- put sticker on ,eter stub out
|