Final | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Eric Strole
|
|
|
FINAL Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
Rough-in | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Eric Strole
|
|
|
Rough In Phone #: ###-#### Inspection requested via web by Diane Day-20 & 60 lb gas test and flue test and rough-in pass.
|
Pressure Test | 12/7/2016 | 12/7/2016 | 12/7/2016 | P | PASS |
Brian Scoles
|
|
|
20lb gas pass
|
Rough-in | 12/1/2016 | 12/7/2016 | 12/7/2016 | P | FAIL |
Brian Scoles
|
|
|
Rough in and pressure test Phone #: ###-#### Inspection requested via web by Diane Day- flue pressure at 4lbs- b vent needs 1" clearance to combustibles in attic and water heater alcove- insulation shield needs fixed on b vent at water heater alcove- left notice on back window
|