Final | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 1/19/2017 | 1/20/2017 | 1/20/2017 | A | PART |
Chad Schwendiman
|
|
|
partial cover for under mezz - call tony Phone #: ###-#### Inspection requested via web by Brandon - Okay to cover ceiling below the mezzanine.
|
Final | 1/18/2017 | 1/19/2017 | 1/19/2017 | A | PART |
Bill VanDegrift
|
|
|
partial final for under the mezzanine - call cyrus Phone #: ###-#### Inspection requested via web by Brandon Sorensen ok for ceiling tile 3 rooms north west corner
|
Final | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | CANC |
Alan Hauser
|
|
|
Partial Final for under the mezzanine.- call cyrus Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen Inspection cancelled from web by: Brandon Sorensen
|
Rough-in | 1/11/2017 | 1/12/2017 | 1/12/2017 | A | PASS |
Alan Hauser
|
|
|
final layer of fire wrap for grease duct ok
|
Rough-in | 1/11/2017 | 1/11/2017 | 1/11/2017 | P | CANC |
Alan Hauser
|
|
|
final final wrap inspection for grease duct Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen Inspection cancelled from web by: Brandon Sorensen
|
Rough-in | 1/9/2017 | 1/10/2017 | 1/10/2017 | A | PART |
Alan Hauser
|
|
|
first layer fire wrap ok
|
Rough-in | 1/6/2017 | 1/6/2017 | 1/6/2017 | P | PASS |
Alan Hauser
|
|
|
light test for grease duct - call tony Phone #: ###-#### Inspection requested via web by Brandon Sorensen
|
Conference | 12/16/2016 | 12/19/2016 | 12/19/2016 | A | PASS |
Alan Hauser
|
|
|
will look at grease duct in field after installation
|
Conference | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | PART |
Alan Hauser
|
|
|
Light test for grease duct at our shop location on 2925 South Cole Rd, Boise, ID 83709. Grease duct will be accessible in our shop for inspection. light test passed
|
Rough-in | 12/8/2016 | 12/9/2016 | 12/9/2016 | A | PART |
Alan Hauser
|
|
|
shafts on 2nd floor ok for cover
|
Rough-in | 12/2/2016 | 12/5/2016 | 12/5/2016 | A | PASS |
Chad Schwendiman
|
|
|
sealer inspection for 2nd floor Phone #: ###-#### Inspection requested via web by Brandon Sorensen - duct seal pass on 2nd floor
|
Rough-in | 11/29/2016 | 11/30/2016 | 11/30/2016 | A | PASS |
Alan Hauser
|
|
|
duct sealed 1st floor up through 2nd flr shaft and on 2nd floor
|
Conference | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PART |
Chad Schwendiman
|
|
|
sealer inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen - okay to insulate duct work on 2nd floor east side
|
Rough-in | 11/4/2016 | 11/7/2016 | 11/7/2016 | A | PART |
Alan Hauser
|
|
|
all duct in back area ok for insulation
|