Final | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Rough-in | 3/6/2017 | 3/8/2017 | 3/8/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- ok for cover
|
Rough-in | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | PART |
Brian Scoles
|
|
|
please call ernie in advance thanks Phone #: ###-#### Inspection requested via web by Nicholas Paige- phase 2- seal on pipe ok- ok to insulate
|
Final | 12/20/2016 | 12/21/2016 | 12/21/2016 | A | PART |
Brian Scoles
|
|
|
partial final inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige- elbows need insulated at entry way- rest looks ok- ok to install ceiling tiles after all trades are complete with inspections
|
Rough-in | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PART |
Brian Scoles
|
|
|
Hard Rock Cover inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige- hard lid ok to cover in bathroom- ok for grid install- reinspect before tile is set
|
Rough-in | 11/7/2016 | 11/8/2016 | 11/8/2016 | A | PART |
Brian Scoles
|
|
|
partial cover inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige- seal ok- ok to insulate- need to inspect exhaust fans after their finshed before ceiling cover
|