Final | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Canfield
|
Final | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Canfield need 2nd condensate drain, condencer needs to be set for final,
|
Rough-in | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PASS |
Ben Livingston
|
|
|
plans are in abs pipe on corner of shed behind house Phone #: ###-#### Inspection requested via web by Steve Canfield 20lb gas, 5lb flue rough in
|