Final | 5/9/2017 | 5/10/2017 | 5/10/2017 | A | PASS |
Eric Strole
|
|
|
Field Super: Daryl Thomas Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
Rough-in | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Eric Strole
|
|
|
|
Final | 3/17/2017 | 3/20/2017 | 3/20/2017 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
Rough-in | 3/13/2017 | 3/16/2017 | 3/16/2017 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Lisa Whitney- b vent needs 1" clearance at water heater location at ceiling- insulation shield 2nd floor needs fixed- talked to Daryl by phone
|
Pressure Test | 3/13/2017 | 3/16/2017 | 3/16/2017 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Lisa Whitney- 5lb flue pass- 20lb gas fail guage at 15psi
|