Final | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Chad Schwendiman
|
|
|
Shaun: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello
|
Final | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | FAIL |
Bill VanDegrift
|
|
|
this permit was finaled in error, 1) provide engineering for the roof addressing any additional load imposed by the larger RTU. left message with Frank.
|
Final | 2/2/2017 | 2/3/2017 | 2/3/2017 | P | CANC |
Ben Livingston
|
|
|
Late PM if possible Shaun: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello
|
Final | 1/25/2017 | 1/30/2017 | 1/30/2017 | P | CANC |
Chad Schwendiman
|
|
|
Shaun: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello
|