Pressure Test | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Ben Livingston
|
|
|
Please call Phil prior to arriving to the job to ensure they are ready for the pressure test. At ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby 5lb flue
|
Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Ben Livingston
|
|
|
Please call Phil prior to arriving to the job to ensure they are ready for the pressure test. At ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
Mec-Aging Inspection | 10/23/2017 | 10/23/2017 | 10/23/2017 | | PEND |
Ben Livingston
|
|
|
|
Final | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | FAIL |
Ben Livingston
|
|
|
Prior arrival give 1 hour call to Eric. ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby need a flue pressure test
|