Final | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
Rough-in | 2/8/2017 | 2/9/2017 | 2/9/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
Rough-in | 2/3/2017 | 2/6/2017 | 2/6/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero- B Vent needs 3 inches of clearance from top of pipe to combustibles where penetrates into hallway enclosure
|