Final | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | PASS |
Ben Livingston
|
|
|
Final reinspection Phone #: ###-#### Inspection requested via web by Andrea Creek
|
Final | 5/17/2017 | 5/18/2017 | 5/18/2017 | P | FAIL |
Ben Livingston
|
|
|
FINAL Phone #: ###-#### Inspection requested via web by Andrea Creek armaflex needs uv protection, need air balance report, 2nd condensate drain needs to be run
|
Rough-in | 2/9/2017 | 2/10/2017 | 2/10/2017 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek
|
Rough-in | 2/7/2017 | 2/8/2017 | 2/9/2017 | A | FAIL |
Ben Livingston
|
|
|
rough in and pressure witness Phone #: ###-#### Inspection requested via web by Andrea Creek 20lb gas ok, 5lb flue ok gas piping tee and valves need to be supported from structure need approved manual j for rough-in,
|