Final | 6/19/2017 | 6/19/2017 | 6/19/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss
|
Rough-in | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | PEND |
Brian Scoles
|
|
|
added bath fan exhaust ducting. Phone #: ###-#### Inspection requested via web by Krista Boss- need to complete primary and secondary drains for final- R/I ok combustion air was added to floor
|
Final | 3/28/2017 | 3/28/2017 | 3/28/2017 | P | FAIL |
Brian Scoles
|
|
|
needs combustion air in floor in furnace closet- r/i in on bath fans ok to cover-
|
Rough-in | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Krista Boss Inspection cancelled from web by: Krista Boss
|
Final | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | NR |
Brian Scoles
|
|
|
Would like call when on way. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria- will reschedule
|