Final | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Ben Livingston
|
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria
|
Final | 4/14/2017 | 4/14/2017 | 4/14/2017 | P | FAIL |
Brian Scoles
|
|
|
Would like PM and Call when on way Phone #: ###-#### Inspection requested via web by Xanti Berria- b vent in garage needs 1" clearance to combustibles and trim ring installed and remove fire caulk at ceiling level- need 3 screws per joint in b vent flue pipe at water heater- outside air to R/A plenum needs insulated- seal joints on R/A plenum off furnace???- left correction notice on furnace in garage-
|
Rough-in | 2/27/2017 | 3/1/2017 | 3/1/2017 | A | PASS |
Brian Scoles
|
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria- R/I ok
|
Pressure Test | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Brian Scoles
|
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria- 20lb gas pass- need to have drip legs for W/H and furnace between shut off valves and appliances at final
|
Conference | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | DONE |
Brian Scoles
|
|
|
talked about location of b vent with contractor and builder- needed chase for it to be installed- resolved issue per conversation
|