Final | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Alan Hauser
|
|
|
|
Final | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | NR |
Alan Hauser
|
|
|
Contact person on job is Tim Sanders ###-####. Plz call when headed to site. He will meet you there. Phone #: ###-#### Inspection requested via web by Angie Thome
|
Rough-in | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Angie Thome- need to update exhaust fans to units installed and sizes on drawing and schedule- different brand- EF 2 is now in breakroom instead of work room- mop sink moved- talked with Rick at Custom heating about these changes that need made before final- ok to cover-
|
Pressure Test | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Angie Thome- 20lb gas pass
|