Final | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Jack Reynolds
|
|
|
Jake Phone #: ###-#### - furnace ac coil co ok
|
Mec-Aging Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 | | CANC |
Jack Reynolds
|
|
|
|
Final | 7/2/2018 | 7/6/2018 | 7/6/2018 | P | PART |
Jack Reynolds
|
|
|
Please call Jake at ###-#### when you are on your way. Thanks! Phone #: ###-#### Inspection requested via web by Angie Pereira- air balance ok- duct blast ok- flue clearances ok just need to finish trim ring at ceiling- secoundary drain with wet switch ok- need to see exhaust fans finished- looks like a kitchen cabinet still needs to be in place so a supply run can be finished make sure its ducted all the way out of cabinet- also want to know whats happening with the fireplace before a final can be done
|
Mec-Aging Inspection | 5/22/2018 | 5/22/2018 | 5/22/2018 | | FAIL |
Jack Reynolds
|
|
|
failed mec aging inspection- no air balance report- secoundary drain cant be piped into primary drain- need 1" clearances on b vent flue for furance thats going through the ceiling
|
Rough-in | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Chad Schwendiman
|
|
|
Jake Phone #: ###-####
|
Mec-Aging Inspection | 12/27/2017 | 12/27/2017 | 12/27/2017 | | CANC |
Brian Scoles
|
|
|
no calls
|
Mec-Aging Inspection | 9/27/2017 | 9/27/2017 | 9/27/2017 | | PART |
Brian Scoles
|
|
|
no calls- no work going on a house-
|
Final | 3/8/2017 | 3/10/2017 | 3/10/2017 | A | FAIL |
Chad Schwendiman
|
|
|
Angie-would like as late am as possible Phone #: ###-####-please call to meet - This should have been a rough in. need to submitt a manual J for approval, Need 1" clearance to combustables from b-vent, need 6" clearance to combustables from single wall vent, need to vent bath fan. Need to get plumbing permit
|