Final | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Toomey
|
Final | 7/6/2017 | 7/6/2017 | 7/6/2017 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Toomey-Need to complete all gass. Need to install w/h flues. Need to seal all ducts at furnaces. Need to finish primary and secondary condensates.
|
Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Toomey-Leave air balance with duct blast report by final.
|
Rough-in | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PART |
Ben Livingston
|
|
|
Also Fireplace Phone #: ###-#### Inspection requested via web by Aaron Toomey fireplace okay, all metal duct needs to be sealed
|
Pressure Test | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Ben Livingston
|
|
|
5lb flue x2
|
Pressure Test | 3/6/2017 | 3/6/2017 | 3/6/2017 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Toomey 60, 20 lb gas
|