Final | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
Rough-in | 3/24/2017 | 3/27/2017 | 3/28/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka-
|
Rough-in | 3/27/2017 | 3/28/2017 | 3/28/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino
|
Pressure Test | 3/24/2017 | 3/27/2017 | 3/27/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 5lb flue pass
|
Rough-in | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- b vent 2nd floor needs completed with framing and 1" clearance to combustibles in bedroom #3 closet where b vent comes out of chase below closet ceiling- flue test fail- guage at zero- left correction notice front window
|
Pressure Test | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass- 5lb flue fail- guage at zero
|