Final | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Chad Schwendiman
|
|
|
FINAL INSPECTION FOR ENTIRE HVAC SYSTEM. PLEASE CALL LAURIE AT THE NUMBER LISTED ABOVE WHEN EN ROUTE. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
|
Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Brian Scoles
|
|
|
R/I ok- furnace is in garage not shop now
|
Rough-in | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PEND |
Brian Scoles
|
|
|
Balinda-homeowner Phone #: ###-####- insulation shield on b vent in attic
|
Rough-in | 3/14/2017 | 3/14/2017 | 3/14/2017 | P | FAIL |
Ben Livingston
|
|
|
Tech. Patrick ###-#### Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING need approved manual j on site for rough-in inspection
|
Pressure Test | 3/14/2017 | 3/14/2017 | 3/14/2017 | P | PASS |
Ben Livingston
|
|
|
Tech. Patrick ###-#### Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING 20lb gas, 5lb flue
|