Final | 5/1/2018 | 5/2/2018 | 5/2/2018 | A | PASS |
Eric Strole
|
|
|
Re-inspect plumbing drains on mini splits for C of O Phone #: ###-#### Inspection requested via web by Aaron Allred
|
Final | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | FAIL |
Ben Livingston
|
|
|
Re-inspect plumbing drains on mini splits for C of O Phone #: ###-#### Inspection requested via web by Aaron Allred corrections not made
|
Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | FAIL |
Chad Schwendiman
|
|
|
Lyman ###-#### - Need to complete condensate on ductless units
|
Final | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PART |
Eric Strole
|
|
|
Units 309-319 and units 209-219 Phone #: ###-#### Inspection requested via web by Aaron Allred-Rooms 209 thru 219 & 309 thru 319 pass.
|
Final | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | PART |
Ben Livingston
|
|
|
Units 409-419 and Units 509-519 Phone #: ###-#### Inspection requested via web by Aaron Allred
|
Rough-in | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Ben Livingston
|
|
|
Above grid 2nd and 3rd floor corridors. Phone #: ###-#### Inspection requested via web by Aaron Allred
|
Rough-in | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PASS |
Eric Strole
|
|
|
Above grid fourth floor corridor. Phone #: ###-#### Inspection requested via web by Aaron Allred
|
Rough-in | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Ben Livingston
|
|
|
Above grid 5th floor corridor. Phone #: ###-#### Inspection requested via web by Aaron Allred
|
Final | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | PART |
Eric Strole
|
|
|
Unit 201 through 208 Phone #: ###-#### Inspection requested via web by Aaron Allred-Rooms 201 thru 208 pass.
|
Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | P | PART |
Eric Strole
|
|
|
Unites 301-308 Phone #: ###-#### Inspection requested via web by Aaron Allred-Rooms 301 thru 308 pass.
|
Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PART |
Eric Strole
|
|
|
Unites 401-408 Phone #: ###-#### Inspection requested via web by Aaron Allred-Rooms 401 thru 408 pass.
|
Final | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | PART |
Eric Strole
|
|
|
Units 501-508 Phone #: ###-#### Inspection requested via web by Aaron Allred-Rooms 501 thru 508 pass.
|
Rough-in | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PART |
Eric Strole
|
|
|
Damper Angles Phone #: ###-#### Inspection requested via web by Aaron Allred-Angle inspection for fire/smoke dampers in shaft 2nd thru 5th pass.
|
Rough-in | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | FAIL |
Eric Strole
|
|
|
Damper Angles Phone #: ###-#### Inspection requested via web by Aaron Allred-Need to secure 1 sided angle installation on fire/smoke dampers 2nd thru 5th flr per manufacture installation instructions.
|
Rough-in | 3/23/2018 | 3/26/2018 | 3/26/2018 | A | PART |
Eric Strole
|
|
|
Four Floors Phone #: ###-#### Inspection requested via web by Aaron Allred-Clearance on fire/smoke dampers in shaft 2nd thru 5th pass.
|
Rough-in | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PART |
Eric Strole
|
|
|
5th 3rd fourth and 2nd tower one above grid corridors. Phone #: ###-#### Inspection requested via web by Aaron Allred-Above grid tower one 2nd thru 5th pass.
|
Rough-in | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PART |
Ben Livingston
|
|
|
First Floor Lobby inspection. Phone #: ###-#### Inspection requested via web by Aaron Allred lobby okay, 4th and 5th floor fire smoke dampers back side clearance ok, need fire caulk on pool heater fire stops, fasten out side fire stops and seal
|
Conference | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PART |
Eric Strole
|
|
|
Conferance on fire/smoke damper in shaft.-Conferance and angle on fire/smoke dampers in shaft floor only 2nd thru 5th pass
|
Conference | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Ben Livingston
|
|
|
Conferance on fire/smoke damper in shaft.
|
Rough-in | 2/27/2018 | 2/28/2018 | 2/28/2018 | A | PART |
Eric Strole
|
|
|
3rd-floor lobby and 2nd-floor dampers Phone #: ###-#### Inspection requested via web by Aaron Allred-Angle inspection on fire/smoke dampers in lobby on 2nd flr and duct seal 2nd & 3rd flr lobby area pass.
|
Rough-in | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PART |
Eric Strole
|
|
|
Fourth Floor Lobby Fire/Smoke Damper Angle Inspection. Phone #: ###-#### Inspection requested via web by Aaron Allred-Angles for 4th flr lobby fire/smoke dampers pass.
|
Rough-in | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PART |
Eric Strole
|
|
|
Fourth Floor Lobby Phone #: ###-#### Inspection requested via web by Aaron Allred-3rd, 4th, 5th flr duct seal in shaft & 4th flr lobby duct seal pass.
|
Rough-in | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | PART |
Eric Strole
|
|
|
units 209 through 219 Phone #: ###-#### Inspection requested via web by Aaron Allred-units 209 thru 219 pass.
|
Rough-in | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PART |
Eric Strole
|
|
|
Building 1 Rough-in. Inspection requested for 2nd floor damper spacing. Phone #: ###-#### Inspection requested via web by Aaron Allred-Clearance on 3 fire/smoke dampers 2nd flr corridor pass.
|
Rough-in | 2/19/2018 | 2/20/2018 | 2/20/2018 | A | NR |
Eric Strole
|
|
|
2nd floor damper spacing Phone #: ###-#### Inspection requested via web by Aaron Allred-Not ready
|
Rough-in | 2/7/2018 | 2/8/2018 | 2/8/2018 | A | PART |
Eric Strole
|
|
|
Units 309-319 Phone #: ###-#### Inspection requested via web by Aaron Allred-Units 309 thru 319 r/i pass.
|
Conference | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Ben Livingston
|
|
|
|
Rough-in | 2/5/2018 | 2/6/2018 | 2/6/2018 | A | PART |
Eric Strole
|
|
|
5th Floor Corridor Phone #: ###-#### Inspection requested via web by Aaron Allred-Angle inspection on 3 fire/smoke dampers 5th flr corridor pass & lobby duct seal pass.
|
Rough-in | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PART |
Eric Strole
|
|
|
Dampening Phone #: ###-#### Inspection requested via web by Aaron Allred-clearances for 3 fire/smoke dampers in corridors on 3rd & 4th flr pass.
|
Rough-in | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | PART |
Eric Strole
|
|
|
Lyman Phone #: ###-####-Clearance inspection on 3 fire/smoke dampers in corridor on 5th flr pass.
|
Rough-in | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | PART |
Eric Strole
|
|
|
Carson Phone #: ###-####-Ducting in units 409 thru 419 pass.
|
Rough-in | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PASS |
Ben Livingston
|
|
|
Ducting for units 509 - 519 - Lyman Phone #: ###-####
|
Rough-in | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | FAIL |
Eric Strole
|
|
|
Ducting for units 509 - 519 - Lyman Phone #: ###-####Need to support ducts every 8'.
|
Rough-in | 12/5/2017 | 12/5/2017 | 12/5/2017 | P | PART |
Eric Strole
|
|
|
Unit 201-208 // Lyman Phone #: ###-####-Units 201 thru 208 pass.
|
Rough-in | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Ben Livingston
|
|
|
Lyman Phone #: ###-#### 301-308 okay
|
Rough-in | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | PART |
Eric Strole
|
|
|
3rd and 4th corr. // Lymon Phone #: ###-####-4th flr corridor and west end of 3rd flr corridor pass.
|
Rough-in | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PART |
Eric Strole
|
|
|
Building 2, floors 3,4,5- grid- Lyman Phone #: ###-####-5th flr grid & west side 4th flr grid pass.
|
Rough-in | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PASS |
Ben Livingston
|
|
|
Lyman Phone #: ###-#### 401-408 okay
|
Rough-in | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Ben Livingston
|
|
|
Fifth Floor 501-508 rooms. Phone #: ###-#### Inspection requested via web by Aaron Allred 501-508 duct soffits ok
|
Rough-in | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PART |
Ben Livingston
|
|
|
Dryer vent Phone #: ###-#### Inspection requested via web by Aaron Allred dryer vents and linesets okay 4th and 5th floor north side of building and 209,309,409,508 except 518 dryer vent needs wall furred out
|
Rough-in | 9/6/2017 | 9/6/2017 | 9/6/2017 | P | PART |
Eric Strole
|
|
|
unit 508 dryer vent // Aaron Phone #: ###-####-Inwall dryer exhaust and line-set pass 5th flr.
|
Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | FAIL |
Eric Strole
|
|
|
Anthony Phone #: ###-####-Sheetrock has not been removed.
|
Rough-in | 8/31/2017 | 8/31/2017 | 8/31/2017 | A | PART |
Eric Strole
|
|
|
Dryer exhausts and line-sets 2nd & 3rd flr inwall pass except units 209,309,409 & 509 pass. Those other 4 units need the wall furred out for the dryer exhausts.
|
Rough-in | 8/30/2017 | 8/30/2017 | 8/30/2017 | P | PART |
Eric Strole
|
|
|
Anthony Phone #: ###-####-dryer vents and line-sets in units 510 thru 516 & 519 & 520 and 4th flr ok to cover walls.
|